This site uses cookies. Click the privacy policy button to read how we handle personal data.

Menu

Timber Frame - Internal

SF TV

Timber Frame

Internal Solutions

SF19+

Timber Frame

Internal Solutions

SF 40

Timber Frame

Internal Solutions

SF 60

Timber Frame

Internal Solutions

  • CERTIFIED HIGH PERFORMANCE

  • SUITS ALL BUILD TYPES

  • QUICK AND EASY TO INSTALL

logos

Fixing Instructions

Timber Frame

SuperFOIL is installed over the timber wall studs horizontally or vertically, using the correct size galvanized or stainless-steel staples at 300mm intervals. Care should be taken to ensure that any overlaps are at least 50mm and are taped over with 100mm Superior Foil Tape. SuperFOIL should be sealed to other air and vapour barriers at floors and roof junctions. The products are then further held in place by the correct size timber battens installed horizontally at no greater than 600mm centres. Timber battens should always be installed around the perimeter of floors, roofs, windows and doors. Plasterboard is then fixed to the timber battens in accordance with the manufacturer's guidance. For maximum performance, SuperFOIL should be installed with two unventilated cavities.

sf19

SuperFOIL is now BBA Certified 

Click below to find out how this affects you.

No Thanks